Value Added

Columbia, S.A. 125 MW Hydro unit. Seven major arc flash faults Repair implemented returning The unit into service in 3 months.

SF6 Breaker

VAI created a 2-day by-pass for a damaged SF6 breaker Avoiding B.I.

OEM Blames Owner for Damaging H.P. Impulse Wheel

Vinoski & Associates, Inc. – Led by Dan Kelso with the support of our metallurgist Joe Daleo prove the OEM compromised the blades, making them susceptible to steam admission excitation and subsequent failure.

501J CTG 330 MW

We participated in the TP inspections, at night and on the weekend. OEM declared 5 had to be inspected for contamination, although no contamination was visible – only water marks (dried deposits).

Argentina, S.A. Transmission Distribution

New repairs to a 45-year paper insulated line induced secondary cracking and compromised the integrity of the paper insulation (causing cracking).

Aerospace, Aviation, Jet Propulsion, etc.

Claim Damage, Reparability, Replacement Valuations, Salvage

550 MW STG Loss of DC Power

The insurers asked us to do an EPC Design Review, we listed several un-safe modes of failure. This design was used in 6 other power plants in South America.

6 MW STG Rotor Liberation

The insurers asked us to do an EPC Design Review, we listed several un-safe modes of failure. This design was used in 6 other power plants in South America.

Wind Turbine Generator

Latent Design Defects

Solar Energy Thermal/Photovoltaic

Latent Design Defects, Mis-managed Upgrades, Operational Damages

Compressor Clashing (“Surge”)

OEMs blame operators for their loss. Clashing often is based on “surge conditions” Clashing is due to the physical flexing of the outer casing.

OEM “Cannot determine the Root Cause”

VAI identified the root cause converting insurance claim to OEM warranty

6,500 HP Motor- Red Gear-Ball Mill

Within a few days VAI determined a torque issue Rick O’Mahony determined that the damage, as supported by our vibration expert, were occurring during startups and Rick declared that one of the soft-start liquid resistors was the problem.

Repetitive Compressor Failures

Repetitive Compressor Failures VAI identified a marginal design Recommends risk mitigation to insurance underwriters.

250 MVAR Synchronous Condenser

New units developed pole cracks Identified a manufacturing error

250 MVA Transformer

Superficial casing damage the OEM rejected the unit, but easily repaired for spare unit